CFS BENEFITS
01
50% LIGHTER THAN TYPICAL STRUCTURES
CFS framing materials are lighter than masonry, structural steel, and even wood structures; which leads to cheaper foundations, podiums, and less overall building costs.
03
HIGH PREFORMANCE ACOUSTICAL RAITNGS
Our light-gauge steel and/or hybrid systems can meet or exceed the minimum code requirements for IIC and STC using a combination of CFS and finished products.
02
OFF-SITE FABRICATION OF COMPONETS
Off-site fabrication in a controlled environment reduces manpower, eliminates delays, and improves the quality of products. With impending labor shortages, pre-fabrication is definitely the way of the future.
04
LESS ON-SITE MANPOWER WITH QUICKER INSTALLATION
05
COMPLETE NON-COMBUSTIBLE SYSTEM
Our innovative systems can be installed quickly with a 10-12 man crew size to achieve approximately 7,000-8,000 square feet per week.
Our CFS systems are completely non-combustible. This makes for a safer job site and creates a safer future dwelling for families to live.
06
LOWER INSURANCE COSTS
07
Builders risk and property insurance is less-expensive than traditional methods using our non-combustible steel framing.
LONG-LASTING STRUCTURAL INTEGRITY
CFS framing systems are built to last in their environment. G60 and G90 galvanizations protect the steel from rusting and provides great structural integrity well into the future.
09
DESIGN FLEXIBILITY
CFS framing systems have one of the best strength-to-weight ratios of all building products, allowing for greater spans, unique designs, and architectural flexibility.
11
LOW MAINTANCE COSTS FOR FUTURE
08
SUSTAINABLE + CARBON FRIENDLY PRODUCTS
Our all CFS or Mass Timber Hybrid solutions are a great way to achieve sustainable construction. Our buildings are made from recycled materials using an energy-efficient process. CFS, along with Mass Timber, has one of the lowest carbon footprints of any building material.
10
SUB-TRADE FRIENDLY INTERACTION
Mechanical, Electrical, and Plumbing can work together seamlessly in the CFS floor and wall cavities. Chases and knock-outs provide plenty of space for proper MEP design and installation.
CFS does not shrink, rot, rust, gather mildew, and remains a high-quality, stable product, which reduces overall maintenance costs for years to come.
12
BEST OF BEST CFS AVAILABLE
There are various CFS options available on the market today. Steel Evolution will evaluate and value-engineer your design intent to provide the most cost-effective solution for your project. We strive to save time and money every step of the way.
PRE-FAB BENEFITS
01
SPEEDS UP THE SCHEDULE ENSURING A FASTER RETURN ON INVESTMENT
Pre-fabrication reduces project schedules to obtain a faster return on the client's investment. It eliminates delays due to weather and creates ideal working conditions; simplifying the construction process for a more accurate and cost-effective timeline. This also reduces carrying costs and general conditions.
02
BETTER QUALITY IN A CONTROLLED ENVIRONMENT
Treacherous conditions such as rain, sleet, hail, snow, and high winds do not affect the quality and build-time of our products assembled in a pleasant, indoor environment.
03
REDUCES ON-SITE MANPOWER REQUIREMENTS
Building off-site reduces the crew-sizes needed in the field. With increasing labor rates and demand for manpower, off-site construction is a must for future success.
04
IMPROVES JOB SITE SAFTEY + REDUCES RISK
05
Less men needed on site and a shorter duration helps reduce the risk of accidents from occurring throughout the building process.
REDUCES WASTE FOR A CLEANER JOB SITE
The elimination of field cutting through panelization reduces on-site waste. This leads to very clean and safe work environments.
06
LOWERS THE OVERALL COST OF THE STRUCTURE
When properly designed and built, CFS panelization along with our value-engineering offerings can lead to tremendous savings at all phases of construction.
07
JUST IN TIME DELIVERIES TO REDUCE LAYDOWN AREA
Steel Evolution arranges sequenced deliveries to arrive and be placed on-site accordingly. This eliminates double-handling and saves staging space at the job site.